Novo mesto/658 m² plot/Designed in LynxCraft
123.2 m²Net living area
310,764 €Estimated investment
24 mo.To move-in
01 Design

What you see

The concept design is a complete presentation that connects the land, the spatial plan and your living needs into a concrete house proposal.

It covers the placement on the plot, a feasibility study, the project timeline and an estimate of the total investment. It was prepared for a plot in Novo mesto.

Plot658 m²
Gross floor area160 m²
Net living area123.2 m²
StoreysG + 1
Estimated investment310,764 €
02 Exterior

How it will look

1 visualisations
Visualisation 1
Visualisation 1
04 Plot

Where it stands

Plot size658 m²
Parcel number1229
Cadastral municipality1455 BRŠLJIN
MunicipalityNovo mesto

Land use on the plot

SS, Stanovanjske površine658 m²
Where it stands — Novo mestoWhere it stands — Novo mesto
05 Feasibility

Feasibility report

Verdict: Feasible (fully compliant with spatial planning conditions) Estimated likelihood of obtaining a building permit: 95 %

Main reasons for this assessment: 1. Compliant land use and building typology: The entire parcel area of 658 m² is classified as residential land use SS – Stanovanjske površine, which explicitly permits detached single-family residential buildings (Novo mesto OPN, 116. člen). The proposed single-family house aligns directly with the basic purpose of the spatial planning unit NBŠ_02. 2. Full adherence to development factors (FZ, FI) and morphology: The proposed building features a plot coverage factor (FZ) of 13.68 % (90 m² / 658 m²) and a floor-area factor (FI) of 0.27 (180 m² / 658 m²), both well below the maximum allowed ceilings of 40 % and 0.75 respectively (Novo mesto OPN, 116. člen). Furthermore, the storey count (G + 1), gable roof with a 30° pitch, and floor plan aspect ratio (10.0 × 8.0 m = 1.25, exceeding the minimum 20 % length extension) fully satisfy all municipal architectural criteria (Novo mesto OPN, 116. člen). 3. Verified placement within boundary setbacks and utility readiness: The house footprint is situated entirely within the plot boundaries and complies with the minimum boundary setback of 4.0 m for main buildings up to 14.0 m in height, with the closest calculated distance being 4.61 m (Novo mesto OPN, 72. člen). Furthermore, critical public municipal utility connections (water, sewerage, electricity) are located immediately adjacent to the parcel boundary.

Utility connections

Water supply~ 4 mavailable
Sewerage~ 0 mavailable
Electricity~ 0 mavailable
Gas mains~ 0 mavailable
Electronic communications~ 7 mavailable

Recommendation

The proposed single-family residential house on parcel 1229, k.o. 1455 (BRŠLJIN), within EUP NBŠ_02, is fully feasible and compliant with all statutory zoning criteria of Mestna občina Novo mesto (Novo mesto OPN, 72. in 116. člen). The building footprint, storey count, roof pitch, aspect ratio, and boundary setbacks all satisfy the regulatory thresholds without requiring neighbour consents or spatial variances. The investor should proceed with hiring a certified architect/designer to prepare the building permit project documentation (DGD), verify the status/demolition of the existing registered building, and obtain the necessary utility provider opinions.

06 Investment

What it costs

Estimate as of the design date
Try on your parcel to get the full data
07 Timeline

Construction process

24 months from this design to the occupancy permit.

The timeline is an indicative estimate calculated from the data known about your plot and house. The actual duration depends on how the administrative procedures run, how complete the documentation is, which contractor you choose and the conditions on site.

Ordering location information0.5 mo.
Geodetski načrt0.7 mo.
IDP — concept design0.7 mo.
Preparing DPP documentation0.5 mo.
DPP — obtaining design conditions1 mo.
Geological-geomechanical investigation0.7 mo.
Preparing DGD documentation0.9 mo.
DGD — obtaining opinions0.8 mo.
Update DGD and submit the building-permit application0.2 mo.
Obtaining the building permit4 mo.
Assessment and payment of the municipal contribution0.5 mo.
Legal finality of the building permit0.5 mo.
LynxCraft

Create your own concept design

Enter your plot and how you want to live. The system draws the volume, the floor plan and the investment estimate — the same way this design was made.

Start your design
First design is freeResult in 20 minutesNo obligation