LynxCraft ci 22.4. regen test Start your design
ci 22.4. regen test
Designed with Lynx Copilot

ci 22.4. regen test

Brezovica/13,209 m² plot/Designed in LynxCraft
131 m²Net living area
301,188 €Estimated investment
18 mo.To move-in
01 Design

What you see

The concept design is a complete presentation that connects the land, the spatial plan and your living needs into a concrete house proposal.

It covers the placement on the plot, a feasibility study, the project timeline and an estimate of the total investment. It was prepared for a plot in Brezovica.

Plot13,209 m²
Gross floor area160 m²
Net living area131 m²
StoreysG + 1
Estimated investment301,188 €
02 Exterior

How it will look

3 visualisations
Render 1Render 2Render 3
Render 1
04 Plot

Where it stands

Plot size13,209 m²
Parcel number807
Cadastral municipality335240
MunicipalityBrezovica
Where it stands — BrezovicaWhere it stands — Brezovica
05 Feasibility

Feasibility report

Utility connections

Water supplynot nearbynot in the area
Seweragenot nearbynot in the area
Electricitynot nearbynot in the area
Gas mainsnot nearbynot in the area
Electronic communicationsnot nearbynot in the area
06 Investment

What it costs

Estimate as of the design date
A Projektiranje i prethodne usluge6 %16,690 €
Geodetski situacijski nacrt stvarnog stanja590 €
Idejno rješenje2,600 €
Idejni projekt — građevinska dozvola6,000 €
Glavni projekt7,500 €
B Pristojbe, doprinosi i suglasnosti1 %2,440 €
Upravna pristojba za građevinsku dozvolu90 €
Komunalni doprinos2,200 €
Suglasnosti i služnosti150 €
C Stručne usluge tijekom gradnje4 %11,660 €
Stručni nadzor gradnje11,000 €
Plan izvođenja radova300 €
Koordinator zaštite na radu360 €
D Priprema parcele i priključci3 %9,420 €
Priprema parcele i uklanjanje1,500 €
Priključenje na infrastrukturu4,500 €
Uređenje gradilišta3,000 €
Iskolčenje građevine420 €
E Gradnja83 %250,500 €
Iskopi6,700 €
Komunalni vodovi na parceli i drenaža10,000 €
Gradnja kuće191,400 €
Pomoćne građevine20,000 €
Vanjsko uređenje22,400 €
F Završetak, sukladnost i upis1 %1,678 €
Završna mjerenja i ispitivanja440 €
Geodetska snimka izvedenog stanja360 €
Energetski certifikat300 €
Upravna pristojba za uporabnu dozvolu68 €
Evidentiranje zgrade u katastru340 €
Upis u zemljišne knjige150 €
Određivanje kućnog broja20 €
G Rezerva3 %8,800 €
Nepredviđeni troškovi (3 %)8,800 €
Try on your parcel to get the full data
07 Timeline

Construction process

18 months from this design to the occupancy permit.

The timeline is an indicative estimate calculated from the data known about your plot and house. The actual duration depends on how the administrative procedures run, how complete the documentation is, which contractor you choose and the conditions on site.

Lokacijska informacija i podloge0.3 mo.
Concept design0.7 mo.
Topographical site plan of existing conditions0.5 mo.
Geotechnical investigation0.5 mo.
Obtaining statutory bodies' conditions1.6 mo.
Idejni projekt s popisom suradnika0.8 mo.
Dopuna projekta i predaja zahtjeva — eDozvola0.2 mo.
Issue of the building permit1.2 mo.
Assessment & payment of the development levy0.5 mo.
Building permit becoming final0.8 mo.
Main design (construction documentation)1.5 mo.
Tendering & contractor selection1.2 mo.
LynxCraft