Gdańsk/17,085 m² plot/Designed in LynxCraft
246 m²Net living area
536,382 €Estimated investment
28 mo.To move-in
01 Design

What you see

The concept design is a complete presentation that connects the land, the spatial plan and your living needs into a concrete house proposal.

It covers the placement on the plot, a feasibility study, the project timeline and an estimate of the total investment. It was prepared for a plot in Gdańsk.

Plot17,085 m²
Gross floor area300 m²
Net living area246 m²
StoreysB + G + 1 + 2 + A
Estimated investment536,382 €
02 Exterior

How it will look

3 visualisations
Render 1Render 2Render 3
Render 1
04 Plot

Where it stands

Plot size17,085 m²
Parcel number7/8
Cadastral municipality226101_1.0018.7/8
MunicipalityGdańsk
Where it stands — GdańskWhere it stands — Gdańsk
05 Feasibility

Feasibility report

- Feasibility: Infeasible as currently designed (Non-compliant with storey limits) - Estimated likelihood of obtaining a building permit: 20 %

Main reasons for this assessment: 1. Excessive above-ground storeys: The plan strictly limits buildings to a maximum of 3 above-ground storeys (maksymalna liczba kondygnacji nadziemnych budynków: 3), whereas the proposal includes 4 above-ground storeys (Ground + 1 + 2 + Attic) plus a basement (Gdańsk MPZP, Uchwała nr XXIX/773/26 Rady Miasta Gdańska, 8 ust. 7 pkt 6 lit. b). 2. Permitted land-use and footprint alignment: Single-family residential detached housing (zabudowa mieszkaniowa jednorodzinna wolnostojąca) and the 90 m² footprint conform to the allowed uses and the maximum allowed footprint ceiling of 180 m² (Gdańsk MPZP, Uchwała nr XXIX/773/26 Rady Miasta Gdańska, 8 ust. 3 and 8 ust. 7 pkt 6 lit. a). 3. Pending verification of plot-dependent ratios: Because the total plot area is not specified, compliance with the maximum built coverage (30%), development intensity (0.4 in sub-area "a" or 0.9 in sub-area "b"), and minimum biologically active area (40%) remains conditional (Gdańsk MPZP, Uchwała nr XXIX/773/26 Rady Miasta Gdańska, 8 ust. 7 pkt 2–4).

Recommendation

The proposed concept cannot be approved in its current form due to exceeding the statutory limit on above-ground storeys (4 above-ground storeys proposed vs. maximum 3 allowed under 8 ust. 7 pkt 6 lit. b). The investor should adjust the architectural design by consolidating floor area into no more than 3 above-ground levels and verifying total building height in meters against the 9 m or 12 m limit before submitting a building permit application (wniosek o pozwolenie na budowę).

06 Investment

What it costs

Estimate as of the design date
A Projektiranje in predhodne storitve4 %23,080 €
Geodetski načrt obstoječega stanja580 €
IDP — idejni projekt3,000 €
DGD — dokumentacija za gradbeno dovoljenje5,000 €
PZI — projekt za izvedbo12,000 €
Geološko-geomehanske raziskave2,000 €
Morebitni elaborati in študije500 €
B Takse, prispevki in soglasja3 %15,648 €
Upravna taksa za gradbeno dovoljenje318 €
Komunalni prispevek15,330 €
C Strokovne storitve med gradnjo2 %13,240 €
Gradbeni nadzor11,600 €
Varnostni načrt870 €
Koordinator za varnost pri delu770 €
D Priprava parcele in priključki3 %16,960 €
Priprava parcele in rušitvena dela5,000 €
Priključevanje na infrastrukturo6,100 €
Ureditev gradbišča5,100 €
Zakoličba objekta760 €
E Gradnja83 %447,000 €
Gradnja hiše385,000 €
Komunalni vodi na parceli16,800 €
Pomožni objekti17,500 €
Zunanja ureditev27,700 €
F Zaključek, skladnost in vpis1 %4,854 €
PID — projekt izvedenih del1,200 €
Zaključne meritve in preizkusi1,110 €
Geodetski posnetek izvedenega stanja960 €
Energetska izkaznica350 €
Upravna taksa za uporabno dovoljenje14 €
Vpis stavbe v kataster nepremičnin1,070 €
Vpis v zemljiško knjigo150 €
G Pribitek3 %15,600 €
Nepredvideni stroški (3 %)15,600 €
Try on your parcel to get the full data
07 Timeline

Construction process

28 months from this design to the occupancy permit.

This timeline is an informative reference estimate using the Slovenian construction programme (SI GCBS) until a dedicated Polish GCBS exists. Actual duration depends on Polish administrative procedures, documentation completeness, the contractor and site conditions.

Ordering location information0.5 mo.
Geodetski načrt0.7 mo.
IDP — concept design0.7 mo.
Preparing DPP documentation0.5 mo.
DPP — obtaining design conditions1 mo.
Geological-geomechanical investigation0.7 mo.
Preparing DGD documentation0.9 mo.
DGD — obtaining opinions0.8 mo.
Update DGD and submit the building-permit application0.2 mo.
Obtaining the building permit4 mo.
Assessment and payment of the municipal contribution0.5 mo.
Legal finality of the building permit0.5 mo.
LynxCraft

Create your own concept design

Enter your plot and how you want to live. The system draws the volume, the floor plan and the investment estimate — the same way this design was made.

Start your design
First design is freeResult in 20 minutesNo obligation